The new Standard Gauge Railway (SGR) is a railway system in Tanzania, consisting of a 1,224-km-long single line with a design speed of 160 km/h and linking the country to the neighboring countries of Rwanda, Uganda, Burundi, and the Democratic Republic of Congo. The railway line alignment passes over some soft soil areas where the soil condition consisted of soft and organic clays with a high ground water table, which made the ground conditions swampy and required ground improvement prior to embankment construction. The chainage where the ground improvement is required involves a 6.5-m-high embankment and a culvert construction. The paper presents the design and construction procedures of the controlled modulus columns (CMC) to transfer the load of the foundation block onto a stiffer layer of soil or rock via load transfer platform. As a result, the settlement of the foundation block was reduced while increasing the bearing capacity.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Embankment Construction on Swampy Area Using Controlled Modulus Columns (CMC) for Standard Gauge Railway Project in Tanzania

  • Lami Karagoz,
  • Altan Erdem,
  • Hasan Burak Gokce

摘要

The new Standard Gauge Railway (SGR) is a railway system in Tanzania, consisting of a 1,224-km-long single line with a design speed of 160 km/h and linking the country to the neighboring countries of Rwanda, Uganda, Burundi, and the Democratic Republic of Congo. The railway line alignment passes over some soft soil areas where the soil condition consisted of soft and organic clays with a high ground water table, which made the ground conditions swampy and required ground improvement prior to embankment construction. The chainage where the ground improvement is required involves a 6.5-m-high embankment and a culvert construction. The paper presents the design and construction procedures of the controlled modulus columns (CMC) to transfer the load of the foundation block onto a stiffer layer of soil or rock via load transfer platform. As a result, the settlement of the foundation block was reduced while increasing the bearing capacity.