For the first time, a national proficiency testing for data center power quality is organized. A verification plan is designed specifically for the operational characteristics of data centers, where all participating laboratories go to the designated micro-module data center for on-site testing. The three-phase standard source is used as the ideal physical sample, and the test parameters include voltage, current, power, frequency, and harmonics. The evaluation is conducted using the percentage relative difference D%. Analysis of the proficiency testing results indicates that there are three factors affecting the results of this verification: pre-experiment preparation, the quality of the testing personnel, and the accuracy of the measuring instruments.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Data Center Power Quality Test Proficiency Testing Scheme and Implementation

  • Anxiang Li,
  • Qingfei Shen,
  • Wei Zhang,
  • Kai Zhang,
  • Yan Zhang

摘要

For the first time, a national proficiency testing for data center power quality is organized. A verification plan is designed specifically for the operational characteristics of data centers, where all participating laboratories go to the designated micro-module data center for on-site testing. The three-phase standard source is used as the ideal physical sample, and the test parameters include voltage, current, power, frequency, and harmonics. The evaluation is conducted using the percentage relative difference D%. Analysis of the proficiency testing results indicates that there are three factors affecting the results of this verification: pre-experiment preparation, the quality of the testing personnel, and the accuracy of the measuring instruments.