System Components and Surrounding Systems of Automatic Train Control Systems
摘要
Automatic train control (ATC) systems are integrated from the very beginning into a system landscape of surrounding system. For new installations the automatic train control system is set up at the same time as the rest of the technical systems. In existing installations, automatic train control systems have to be integrated into the landscape of already existing control systems.