The Ilo´s Copper SmelterCopper smelter of Southern Peru started operationsOperation in 1960 and was modernized and commissioned in 2007 and operates with an Isasmelt furnaceFurnace as a single smeltingSmelting unit (1,200,000 tpy of copper concentratesCopper concentrate), four PS convertersPS converter (two blowing), two anode furnacesAnode furnace and casting twin wheel, and two acid plantsAcid plant. This paper reviews the fulfillment of the environmental objectives of the modernization projectModernization project of the Ilo Copper SmelterCopper smelter, as well as the results of the optimizationOptimization of processes and operationsOperation carried out after its modernizationModernization, and which led to exceeding its smeltingSmelting designDesign capacity.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Southern Peru Ilo Copper Smelter—Operational Improvements After Its Modernization

  • Enrique Herrera,
  • Manuel Munguía

摘要

The Ilo´s Copper SmelterCopper smelter of Southern Peru started operationsOperation in 1960 and was modernized and commissioned in 2007 and operates with an Isasmelt furnaceFurnace as a single smeltingSmelting unit (1,200,000 tpy of copper concentratesCopper concentrate), four PS convertersPS converter (two blowing), two anode furnacesAnode furnace and casting twin wheel, and two acid plantsAcid plant. This paper reviews the fulfillment of the environmental objectives of the modernization projectModernization project of the Ilo Copper SmelterCopper smelter, as well as the results of the optimizationOptimization of processes and operationsOperation carried out after its modernizationModernization, and which led to exceeding its smeltingSmelting designDesign capacity.