This chapter relates to the inspection and survey of pipelines at different phases including fabrication, installation, and testing after installation. The phases of fabrication and construction covered by this chapter include pipe and coating manufacture, fabrication, assembly, and line pipe pressure test. The phases of installation include route survey of the pipelines, preparation, transportation, field installation, construction, system pressure test and survey of the as-built installation. The post-installation phase includes survey for continuance of classification, accounting for damage, failure, and repair.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Survey, Inspection, and Testing Regimes

  • Alexander Arnfinn Olsen

摘要

This chapter relates to the inspection and survey of pipelines at different phases including fabrication, installation, and testing after installation. The phases of fabrication and construction covered by this chapter include pipe and coating manufacture, fabrication, assembly, and line pipe pressure test. The phases of installation include route survey of the pipelines, preparation, transportation, field installation, construction, system pressure test and survey of the as-built installation. The post-installation phase includes survey for continuance of classification, accounting for damage, failure, and repair.