The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test performed by the Marshal Space Flight Center Modal Test Team. A free-boundary test condition of the Core Stage was simulated as closely as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5–15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Green Run Modal Test of the NASA Space Launch System Core Stage

  • Eric C. Stasiunas,
  • Brendan D. Sontag,
  • Russel A. Parks,
  • Dana E. Chandler

摘要

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test performed by the Marshal Space Flight Center Modal Test Team. A free-boundary test condition of the Core Stage was simulated as closely as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5–15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.