This paper describes the nominal operation plan, results, and other plans of OMOTENASHI, which was developed as the world’s smallest lunar lander and launched as a sub-payload of NASA’s Artemis-1. OMOTENASHI is a 6U CubeSat with limited electric power resources and control capability compared with a typical large spacecraft. Because OMOTENASHI would make its lunar landing directly from a lunar transfer orbit without entering a lunar orbit, it took only five days from rocket separation to landing. Thus, spacecraft power-on, critical operational events, and lunar landing operations must be conducted during this short period. Various solutions were considered for implementing the operation plan under limited spacecraft capabilities and operation time. Unfortunately, the mission failed due to a malfunction immediately after the rocket separation. Although telemetry was received temporarily, the spacecraft could not control its attitude relative to the sun and depleted its battery power. It is suspected that the malfunction was caused by an open valve failure in the gas jet thruster. After failing to make the lunar landing, OMOTENASHI is still traveling through space. As the spacecraft revolves around the sun, there is a gradual change in its orientation, and it generates electricity. Search and recovery operations were conducted, but the spacecraft has yet to be located.

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Operational Plan, Results and Recovery Scenarios of CubeSat Lunar Lander OMOTENASHI

  • Ryo Hirasawa,
  • Tatsuaki Hashimoto,
  • Kakeru Tokunaga,
  • Shintaro Nakajima,
  • Kota Miyoshi,
  • Chikako Hirose,
  • Junji Kikuchi,
  • Nobutaka Bando,
  • Naoki Morishita,
  • Atsushi Tomiki,
  • Wataru Torii,
  • Taichi Ito,
  • Masatsugu Otsuki,
  • Tetsuo Yoshimitsu,
  • Yasuo Ishige,
  • Hiroshi Takeuchi,
  • Yukio Yamamoto

摘要

This paper describes the nominal operation plan, results, and other plans of OMOTENASHI, which was developed as the world’s smallest lunar lander and launched as a sub-payload of NASA’s Artemis-1. OMOTENASHI is a 6U CubeSat with limited electric power resources and control capability compared with a typical large spacecraft. Because OMOTENASHI would make its lunar landing directly from a lunar transfer orbit without entering a lunar orbit, it took only five days from rocket separation to landing. Thus, spacecraft power-on, critical operational events, and lunar landing operations must be conducted during this short period. Various solutions were considered for implementing the operation plan under limited spacecraft capabilities and operation time. Unfortunately, the mission failed due to a malfunction immediately after the rocket separation. Although telemetry was received temporarily, the spacecraft could not control its attitude relative to the sun and depleted its battery power. It is suspected that the malfunction was caused by an open valve failure in the gas jet thruster. After failing to make the lunar landing, OMOTENASHI is still traveling through space. As the spacecraft revolves around the sun, there is a gradual change in its orientation, and it generates electricity. Search and recovery operations were conducted, but the spacecraft has yet to be located.