<p>Current infrastructure management frameworks typically involve replacing bridges at the end of their intended service duration or when significant structural deficiencies arise, resulting in high costs and environmental impacts. Novel structural-strengthening methods using ultra-high-performance fiber-reinforced cementitious composite (UHPFRC) have allowed the preservation of hundreds of bridges in several countries. Their service duration has been extended, and their performance has been improved to match that of a new structure. Examining the Swiss federal network (3903 bridges), it is found that interventions using the UHPFRC method are feasible on more than 99.7% of structures, demonstrating that the structural intervention can be technically applied to most bridges in this network. On the given case study, systematically applying the UHPFRC method would lead to savings of up to 7.7 MtCO<sub>2eq</sub>, and 18.5 billion CHF over the next 80 years compared to current engineering practice. This study highlights the significant potential of systematically implementing the UHPFRC method for sustainable and cost-effective infrastructure management.</p>

错误:搜索内容不能为空,请输入英文关键词
错误:关键词超出字数限制,请精简
高级检索

Environmental and economic benefits of UHPFRC intervention in bridge management for the Swiss network

  • Numa Bertola,
  • Célia Küpfer,
  • Eugen Brühwiler

摘要

Current infrastructure management frameworks typically involve replacing bridges at the end of their intended service duration or when significant structural deficiencies arise, resulting in high costs and environmental impacts. Novel structural-strengthening methods using ultra-high-performance fiber-reinforced cementitious composite (UHPFRC) have allowed the preservation of hundreds of bridges in several countries. Their service duration has been extended, and their performance has been improved to match that of a new structure. Examining the Swiss federal network (3903 bridges), it is found that interventions using the UHPFRC method are feasible on more than 99.7% of structures, demonstrating that the structural intervention can be technically applied to most bridges in this network. On the given case study, systematically applying the UHPFRC method would lead to savings of up to 7.7 MtCO2eq, and 18.5 billion CHF over the next 80 years compared to current engineering practice. This study highlights the significant potential of systematically implementing the UHPFRC method for sustainable and cost-effective infrastructure management.