Reallocation Problems with Minimum Completion Time
摘要
Reallocation scheduling is one of the most fundamental problems in various areas such as supply chain management, logistics, and transportation science. In this paper, we introduce the reallocation problem that models the scheduling in which products are with fixed cost (e.g., transition time), non-fungible, and reallocated among warehouses in parallel, and comprehensively study the complexity of the problem under various settings of the transition time, product size, and capacities. We show that the problem can be solved in polynomial time for a fundamental setting where the product size and transition time are both uniform. We also show that the feasibility of the problem is NP-complete even for little more general settings, which implies that no polynomial-time algorithm constructs a feasible schedule of the problem unless P